Skip to content

B8b: develop-mode DAG walk as harness (frontier/MAX_PARALLEL/worktree) #122

Closed as not planned

Description

@aarontrowbridge

Sub-slice of #115. Port the develop-mode DAG walk (Blocked-by/Part-of frontier, MAX_PARALLEL concurrent worktree engineers, branch merge) out of the orchestrator prompt into the harness. The other half of the orchestrator. Blocked by #120. See amico-plugin#29 (the CC-side root-session invariant) — this is the amicode-side re-home.

Activity

  1. Rchari1 commented on Aug 20, 2026

    @Rchari1
    Member

    Superseded by #368 Autoresearch Studio — the loop is the product (design-of-record `spec-20260813-162300`, decomposed into WS1–WS7 #371–#375).

    The `B*` depth-1 redesign (`spec-20260708-112732`) gated by B0 #107 was never ratified; the harness axis has moved to opencode open + plan-first, telaio by subscription (#398) with:

    This `B*` slice has had no activity since 2026-07-09 and is now tracked under the WS epics. Closing as superseded — please reopen against #368/WS* if any slice still applies.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions