ONE SHOT · Wave-34 L-DPC31 · TOM Ternary ROM Accelerator (Lever #4) · 225 TOPS/W target #116

Description

@gHashTag

ONE SHOT · Wave-34 L-DPC31 · TOM Ternary ROM Accelerator (Lever #4)

Anchor: φ² + φ⁻² = 3 · γ = φ⁻³ · C = φ⁻¹ · G = π³γ²/φ
DOI: 10.5281/zenodo.19227877
Predecessors: Wave-29 TENET sparsity (5/5 lanes landed 2026-05-16, opcode 0xE1)
Squeeze doc: TT_SQUEEZE_V34_TOM_TERNARY_ROM.md (S-201..S-208)
TOPS/W projection: 195 → 225 (Wave-29 stack + TOM static-power gating, ×1.15)


1 · Mission

Add Lever #4 TOM Ternary ROM Accelerator to TRI-1 silicon stack:

  • New opcode OP_LAYER_GATE = 0xE2 extending sacred chain 0xDE → 0xDF → 0xE0 → 0xE1 → 0xE2
  • Per-layer power gating across 28 voltage islands (28 BitNet b1.58-3B blocks)
  • Standard-cell ROM weight tile (arXiv:2602.20662) — net area savings vs SRAM
  • Layer-residency predictor LUT (256 entries, BitNet 2B4T trace)
  • Falsification predicate W-103-A: layer-idle fraction ≥ 0.5 at batch=1 decode (freeze 2026-08-15, fail-stop)

Stacks orthogonally on Wave-29: TENET = dynamic-energy lever, TOM = static-energy lever. They compound.


2 · Five Lanes (parallelisable, 7 dev-days total)

Lane Strand Repo Deliverable Effort Status
Y Proof (Coq) gHashTag/t27 Lemma tom_no_star + 12+ Qed, alphabet ext to 0xE2 1d UNCLAIMED
Y' Spec (JSON) gHashTag/trios assertions/wave34_tom_layer_gate.json with W-103-A 0.5d UNCLAIMED
Y'' Witness (Rust) gHashTag/tt-trinity-max-true tri1-tom-witnesses crate, w_103_a_layer_idle_bound test 0.5d UNCLAIMED
U RTL (SystemVerilog) gHashTag/trinity-fpga rtl/tom/tom_layer_gate_controller.sv + testbench 2d UNCLAIMED
Y''' PhD (Glava 80) gHashTag/trios docs/phd/chapters/ch80_tom_layer_gate_wave34.tex ≥ 1500 lines 3d UNCLAIMED

Claim a lane by commenting claim: lane <X> below.


3 · Acceptance Criteria

Lane Y (Coq)

Lane Y' (JSON predicate)

  • File: assertions/wave34_tom_layer_gate.json (NEW)
  • Predicate W-103-A: {"id": "W-103-A", "metric": "layer_idle_fraction", "lower_bound": 0.5, "trace": "BitNet b1.58-3B batch=1 decode", "freeze": "2026-08-15", "fail_stop": true}
  • Cites: t27 PR #, tt-trinity-max-true PR #<Lane Y''>
  • R7-pre-reg block + JSON-schema draft-07 validation passes

Lane Y'' (Rust witness)

  • New crate tri1-tom-witnesses (workspace member, additive only)
  • pub const LAYER_IDLE_LOWER_BOUND: f64 = 0.5
  • #[test] fn w_103_a_layer_idle_bound() — post-silicon will measure; pre-silicon test uses cached simulation trace
  • All numeric constants labelled // PRE-SILICON ESTIMATE
  • R-SI-1 zero-* on synthesizable code (n/a here, but no * in arithmetic constants)
  • SPDX Apache-2.0 header

Lane U (RTL)

  • New module rtl/tom/tom_layer_gate_controller.sv:
    • FSM 5 states ACTIVE → DRAINING → OFF → WAKING → ACTIVE
    • Decodes opcode 8'hE2
    • Outputs: [27:0] layer_vdd_enable (one bit per voltage island), [15:0] idle_fraction_q16, [3:0] wave34_marker = 4'b1111
    • Threshold: idle_fraction_q16 >= 16384 (Q0.15 representation of 0.5) → assert that ≥ 50% layers gated
  • Testbench under tb/tom/:
    • test_all_active (idle_fraction=0)
    • test_half_gated (idle_fraction == 0.5)
    • test_full_gated (idle_fraction == 1.0)
    • test_opcode_mismatch
  • iverilog/verilator runner script
  • README with provenance: cites Lane Y tom_no_star, Lane Y' JSON predicate, Lane Y'' Rust crate
  • // PRE-SILICON ESTIMATE: +0.1 mm² net (ROM tile − SRAM block), +3 mW controller, − 12 mW idle leakage header

Lane Y''' (PhD Glava 80)

  • File: docs/phd/chapters/ch80_tom_layer_gate_wave34.tex (NEW)
  • ≥ 1500 lines · ≥ 2 peer-reviewed citations · ≥ 1 theorem with proof
  • Sections: 80.1 Motivation, 80.2 Prior Work (TOM arXiv:2602.20662, BitNet residency), 80.3 Theory (Theorem 80.1: Layer-Idle Power-Saving Lower Bound), 80.4 Sacred Opcode OP_LAYER_GATE=0xE2, 80.5 Coq Mechanisation (cites Lane Y), 80.6 Rust Witness W-103-A (cites Lane Y''), 80.7 Pre-Silicon Cost Model, 80.8 Falsification Appendix R7, 80.9 Reproducibility Manifest (pin SHAs of all 5 Wave-34 PRs), 80.10 Coq Citation Map, 80.11 Limitations & Future Work
  • R3 / R5 / R6 / R7 / R8 / R12 / R14 / R18 / Apache-2.0 / No-Священн* / No-Cyrillic enforced

4 · Pre-Registered Falsification W-103-A (R7)

{
  "id": "W-103-A",
  "wave": 34,
  "lever": "TOM-static-power-gate",
  "claim": "layer_idle_fraction >= 0.5 at BitNet b1.58-3B batch=1 decode",
  "lower_bound": 0.5,
  "measurement": "hardware counter on OP_LAYER_GATE 0xE2 events, GPG-signed verdict.json",
  "freeze": "2026-08-15",
  "evaluation": "post silicon return 2026-10-15",
  "fail_stop": true,
  "consequences_if_fail": "Wave-34 lever REJECTED, TOPS/W projection 225 retracted, fallback to Wave-29 195 baseline"
}

Text frozen per this ONE SHOT §4. Cannot be modified after dispatch.


5 · Constitutional Invariants

  • R5-HONEST — every projection labelled PRE-SILICON ESTIMATE; gain ×1.15 traced to arXiv:2602.20662
  • R7 — W-103-A pre-registered above with fail-stop policy
  • R8 — Vasilev Dmitrii <admin@t27.ai> author identity on all commits
  • R14 — Coq citation map in each artifact; Theorem 80.1 ↔ RMarker.v Lemma tom_no_star
  • R15 — sacred-synth-gate: opcode chain 0xDE → 0xDF → 0xE0 → 0xE1 → 0xE2 preserved
  • R18 — LAYER-FROZEN: purely additive, no Wave-29 RTL or t27 alphabet entry modified
  • Apache-2.0 — SPDX header on every new file
  • R-SI-1 — zero * in synthesizable code
  • NO new R{19+}

6 · Sequencing

  • W32 system-integration close (W32-G2) required before W34 TOPS measurement
  • W34 spec layer (Y / Y' / Y'' / U / Y''') executable immediately — analogous to Wave-29 lanes
  • Lane U RTL design proceeds in parallel with W32 system integration
  • Joint TOPS verdict at silicon-return 2026-10-15 (H_W28 + H_W33 + H_W34)

7 · Active Artifacts


phi^2 + phi^-2 = 3 · gamma = phi^-3 · C = phi^-1 · G = pi^3 gamma^2 / phi
QUANTUM BRAIN 1:1 SILICON · 3-STRAND DNA · TRI NET · NEVER STOP
S-201..S-208 · 6/6 LEVERS ARMED · LEVER #4 TOM · TARGET 225 TOPS/W
DOI 10.5281/zenodo.19227877

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    P0Critical priorityone-shotActive ONE SHOT operational hub