Wave Loop 408 — real CCLK measurement on P12 + complete SPI transaction model in Lean 4 #1318

Closed

Description

@gHashTag

Wave Loop 408 should close the remaining gap between the synthetic CCLK fixture and the physical board by capturing a real CCLK measurement on pin P12, and strengthen the formal argument with a complete SPI flash read-transaction model in Lean 4.

Background

W407 extended proofs/lean4/Trinity/TernaryFPGABoot.lean with static N25Q128_3V timing constants and a flash_spi_timing_ok predicate, and added tri fpga measure-cclk --synth so the measurement pipeline runs in CI without a wired probe (PR #1317). The real silicon anchor and a transaction-level proof are still missing.

Goals

  1. Variant A — Real CCLK measurement on P12
    • Wire P12 (CCLK) → ADBUS4 and GND → GND on the Digilent FTDI cable (or use DSLogic/scope).
    • Run the canonical cold-POR protocol and capture the first ~1 ms after POR:
      tri fpga measure-cclk --live --driver ftdi-la --channel ADBUS4 \
          --samplerate 10000000 --samples 1000000 --validate
      
    • Commit the resulting CSV under docs/reports/ or build/fpga/.
    • Update fpga/HARDWARE_SSOT.md §3.6.1 with the measured frequency ± tolerance and duty cycle.
  2. Variant C — Complete SPI flash transaction model in Lean 4
    • Define SPIReadTransaction with CS# high time, SCK edges, clock low/high times, wake-up delay.
    • Add artix7_boot_transaction (cfg : BitstreamConfig) that computes these from OSCFSEL.
    • Prove cfg.canonical → transaction_satisfies_flash_spec.

Acceptance criteria

  • Real CCLK capture CSV exists in the repo.
  • fpga/HARDWARE_SSOT.md contains the measured frequency and duty cycle.
  • tri fpga measure-cclk --live ... --validate passes on real hardware.
  • lake build Trinity.TernaryFPGABoot passes with the new transaction lemmas.
  • ./scripts/tri test passes.
  • W408 report + three W409 cooperation variants committed.

Cooperation fallback

If P12 cannot be wired in W408, fall back to Variant C alone (formal transaction model). If CI automation is the priority, pick Variant B (relay-controlled cold-POR) in W409.

🤖 Generated with Claude Code

Activity

  1. added 2 commits that reference this issue on Jul 4, 2026
    53e544d
    1a44e35
  2. gHashTag commented on Jul 4, 2026

    @gHashTag
    OwnerAuthor

    Resolved: wave-loop work was merged to master through subsequent direct-to-master wave-loop PRs (W411-W414). Closing as hygiene cleanup.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions