Skip to content

ops(lab): rack Dell switch 3 — rails, firmware, initial config, config stored, labels #6075

Open

Description

@dezren39

Parent: #6066 (home lab build-out).

Drew's item (2026-11-04): rack 3 or 4 Dell switches — this is switch 3 of 3 filed (a 4th gets filed identically if it exists; see #6066).

Steps (Drew's per-switch list):

  • (a) Build the rails and mount the rails; rack the switch
  • (b) Update the firmware; record the firmware version on this ticket
  • (c) Ensure everything works (hardware verification: ports/links, fans, management interface alive)
  • (d) Build and deploy the initial config
  • (e) Ensure the config is stored: switch configs live in the code repo (fleet principle: configs live in code). If no lab switch-config home exists yet, this ticket establishes one (suggested: lab/switches/<hostname>/ in developing-today/code) and records the final path here. Done = the running config is committed there and linked from this ticket
  • (f) Attach appropriate labels to the physical device with the label maker (hostname + role + management address)

Record on this ticket: switch model, hostname, management address, firmware version, stored-config link.

Acceptance criteria

  • Switch racked: rails built and mounted, switch installed.
  • Firmware updated; the firmware version recorded on this issue.
  • Hardware verified: ports/links, fans, management interface alive.
  • Initial config built and deployed; the running config committed to the repo's switch-config home and linked from this issue.
  • Physical device labelled (hostname + role + management address); model, hostname, and management address recorded here.

Activity

  1. added
    kind/choreRoutine maintenance, housekeeping, dependency hygiene
    area/infraInfrastructure, deployment, and operations
    on Nov 5, 2026
  2. developing-today commented on Nov 5, 2026

    @developing-today
    Contributor
  3. added
    priority/normalOrdinary priority (the default)
    effort/mMedium: expected under 1 day of work
    source/humanFiled directly by a human
    mode/physicalNeeds physical hands on site: build, install, cable, or configure devices
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    on Nov 5, 2026
  4. dezren39 commented on Nov 5, 2026

    @dezren39
    MemberAuthor

    Intake review

  5. added
    queue/queuedHas a queued task in the Supabase agent queue
    task/triageQueue packet kind: verify, reproduce, and route this item
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    and removed
    queue/queuedHas a queued task in the Supabase agent queue
    on Nov 5, 2026
  6. dezren39 commented on Nov 5, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · handed off

  7. added
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    status/parkedDeliberately paused with a recorded resume condition
    and removed
    queue/claimedQueue worker lifecycle state
    on Nov 5, 2026
  8. dezren39 commented on Nov 5, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · handed off

  9. dezren39 commented on Nov 5, 2026

    @dezren39
    MemberAuthor

    agent-note:v1
    task: 10438
    state: handed_off
    lane: code-a (execution lane: opencode)

    Picked up by Lane A shift (attempt 1/6). Revalidated 2026-11-05: issue #6075 is OPEN, no held / user/owned / do-not-merge / do-not-auto-edit labels. Execution lane is opencode — handed off to the opencode claimant (repeat handoff: prior park expired unbound). Parking 1800s for the claimant window.

  10. dezren39 commented on Nov 5, 2026

    @dezren39
    MemberAuthor

    Agent note - handed off

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

area/infraInfrastructure, deployment, and operationseffort/mMedium: expected under 1 day of workkind/choreRoutine maintenance, housekeeping, dependency hygienemeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmode/physicalNeeds physical hands on site: build, install, cable, or configure devicespriority/normalOrdinary priority (the default)queue/parkedQueue task is parked (waiting on CI, time, or an event)source/humanFiled directly by a humanstatus/parkedDeliberately paused with a recorded resume conditiontask/triageQueue packet kind: verify, reproduce, and route this itemwork/assignedQueue worker lifecycle state

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions