Skip to content

mcpx: Phase 3 of #2386 — completion register truth-up (retire both #213 gap rows; security row to partial on #1968/#1972) #2389

Closed

Description

@dezren39

Phase 3 of design #2386 (mcpx completion, finished). Design doc: files/designs/code-mcpx-completion-rate-limit-ranking.md in the keep-the-four-repos-healthy goal workspace. GATED on Phases 1–2 of #2386 landing — do not start until both are closed.

Scope

Make the conformance register truthful about completion, in pkgs/mcpx:

Acceptance

Out of scope: implementing any access-control behaviour; touching any other gap row.

Activity

  1. added
    task/triageQueue packet kind: verify, reproduce, and route this item
    status/blockedQueue or user escalation state
    priority/normalOrdinary priority (the default)
    queue/queuedHas a queued task in the Supabase agent queue
    app/mcpxPackage/app: mcpx (pkgs/ or apps/ in this repo)
    effort/sSmall: expected under 2 hours of work
    on Oct 29, 2026
  2. developing-today commented on Oct 29, 2026

    @developing-today
    Contributor
  3. dezren39 commented on Oct 29, 2026

    @dezren39
    MemberAuthor

    🤖 Agent note · filed by design architect

  4. added
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    on Oct 29, 2026
  5. dezren39 commented on Oct 29, 2026

    @dezren39
    MemberAuthor

    Intake review

    Related: #2386 (design), #2387 (Phase 1), #2388 (Phase 2), #1968 / #1972 (the principals/permissive-auth work the security row waits on)

    Notes: Phase 3 of the #2386 mcpx completion design; explicitly GATED on Phases 1–2 (#2387/#2388) closing first, and already labelled status/blocked for that gate. The body carries a full ## Acceptance checklist, so this pass is labels-only. Register truth-up only — no behaviour change in scope.

    Risks: Marking completion-security fully covered would be a false claim: the access-control clause stays partial on #1968/#1972 by design; the retirement wording must keep that visible.

    Suggested approach: Wait for #2387 and #2388 to close, then update the two register rows + requirements.md + conformance-matrix.md in one pass and post the evidence comment on #2386.

    🤖 Agent note · filed

    • Agent: fleet monitor (repo-fleet-monitor)
    • Session / ID: repo-fleet-monitor run 2026-10-29T18:12Z (13:12 CDT)
    • Found via: monitor reconciliation
    • Task: Duty 2 intake enrichment — labels normalized and meta/enriched applied; acceptance criteria appended to the body only where no acceptance section existed (original body preserved verbatim above it). Still-live check this pass: no merged PR or fix commit explicitly resolving this issue was found in this pass's search.
    • Expectation: see the effort label; done = the acceptance criteria are met.
    • Links: this issue
  6. removed
    queue/queuedHas a queued task in the Supabase agent queue
    on Oct 30, 2026
  7. 91 remaining items

  8. added
    queue/claimedQueue worker lifecycle state
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    status/parkedDeliberately paused with a recorded resume condition
    and removed
    status/parkedDeliberately paused with a recorded resume condition
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    queue/claimedQueue worker lifecycle state
    on Nov 2, 2026
  9. dezren39 commented on Nov 2, 2026

    @dezren39
    MemberAuthor

    agent-note:v1 — state: parked at=2026-11-02T02:57:03Z (OpenChamber scheduled lane)

  10. added a commit that references this issue on Nov 2, 2026
  11. dezren39 commented on Nov 2, 2026

    @dezren39
    MemberAuthor

    agent-note:v1
    event: done
    task: 5980
    worker: repo-worker-code (lane A)
    state: Completed via PR #4087, merged da39c0a. Register/docs truthed up; security row remains partial pending #1968/#1972.

  12. removed
    status/parkedDeliberately paused with a recorded resume condition
    queue/parkedQueue task is parked (waiting on CI, time, or an event)
    work/assignedQueue worker lifecycle state
    on Nov 2, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

app/mcpxPackage/app: mcpx (pkgs/ or apps/ in this repo)effort/sSmall: expected under 2 hours of workkind/enhancementmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedpriority/normalOrdinary priority (the default)source/design-architectFiled by the repo design architect jobtask/triageQueue packet kind: verify, reproduce, and route this item

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions