You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Manual CD chart validation fails because Kyverno CLI is missing #4312
Manual CD cannot reach deployment because its isolated chart namespace check invokes the Kyverno CLI without installing it in that job. Run 36831110585, on the merged main commit, failed with kyverno: command not found. The equivalent CI and recovery jobs install the chart-matched CLI before this check.
Install the same pinned CLI in manual CD before chart admission validation, preserving every authorization gate. Validate the workflow and existing contracts, then run manual CD successfully from the merged revision.
Acceptance: manual CD executes the real chart admission and production authorization checks, reaches deployment, and completes its requested post-deployment verification. No gate is skipped or weakened.
Activity