Skip to content

WorldChest — one-week evidence programme (brief §6 tests 1–5, decision return) #7

Open
0 of 8 issues completed

Description

@don-petry

NOT AN OFFICIAL MINECRAFT PRODUCT. NOT APPROVED BY OR ASSOCIATED WITH MOJANG OR MICROSOFT.

Planned from combsmith/worldchest Discussion #6 (graduated from combsmith/incubator Discussion #5). Source of truth: _bmad-output/planning-artifacts/prd.md (FR-1..FR-8) and brief.md §6–§7.

This epic is an evidence programme, not a build. It authorises no product code, Android/iOS app, backend, store listing or paid plan. The backup product (Share-sheet baseline + Shizuku Power mode + Desktop companion, sold as a ~$5/mo Family plan) appears only as the hypothesis under test. Almost every story is human-run (hands_off): interviews, hallway tests, device spikes and the Mojang question cannot be delegated to an agent.

Initiative success metric

The initiative has worked when each of brief.md §6 rows 1–5 carries a dated Result (a value, "not shown", or "not run" with a reason) and a decision comment checks them against Graduation criteria (a) and (b) and the "say no" conditions, within about five working days from the first test (SM-6), with zero lines of product code written (SM-C2). The evidence targets the decision reads against (PRD §8):

  • SM-1: ≥3 of 5 interviewed parents describe a lost-world or device-change incident in the last 12 months.
  • SM-2: fake-door conversion ≥ the pre-set Conversion threshold, counted only if visitors reach the pre-set floor (else inconclusive).
  • SM-3: ≥2 of 3 non-technical parents reach Shizuku's "service running" screen computer-free and unaided.
  • SM-4: a dated legal verdict exists, the Mojang question is sent, and the verdict is "permitted" ("prohibited" = no; "unclear" blocks approval).
  • SM-5 (secondary): share-sheet round trip result recorded on both devices.

Counter-metrics (do not optimise): waitlist size bought with urgency copy (SM-C1); any product code (SM-C2); help given during a hallway test (SM-C3).

Cost cap

  • Time: about one week (≈5 working days) of the owner's time in total (PRD §5, brief §7). FR-4 is time-boxed to one working day; FR-5 reading to about one hour.
  • Money: $0 paid traffic, $0 counsel/legal fees (PRD §5, FR-1/FR-5 out-of-scope). Interview compensation, if any, is the Decider's choice and is recorded with the interview.
  • Agent spend: none planned — all stories are hands-off human work; no dev-lead runs are expected.

Guardrails

  • No child is a participant; no child data is collected. Interview notes name no child.
  • No world files are uploaded anywhere.
  • combsmith/worldchest is public: commit only de-identified, aggregated results (counts, verdicts, device/OS versions). Never commit participant names, emails, phone numbers or raw interview notes.
  • Everything published follows the Naming rule and carries the Disclaimer (FR-6).

Dependency shape

Phase 1: brand-compliance checklist (FR-6) gates the fake-door launch (FR-1, whose thresholds are dated before the first visitor). Phase 2: FR-2, FR-3, FR-4, FR-5, FR-7 run in parallel. Phase 3: FR-8 results + decision, blocked by every test.

Untracked prerequisites

  • Decider's dated "go" comment starting the evidence programme (PRD scope note) — the PRD reserves idea:approved for the post-results decision, but incubator Discussion docs: seed planning artifacts from the incubator package (graduation) #5 already carries idea:approved (2026-10-21); confirm the go is on record before the first test
  • Control of the worldchest.app domain plus a static host for the Fake door page (no evidence in the repo that it is registered or hosted)
  • An anonymous session-analytics provider for the Fake door (chosen and recorded before launch per FR-1)
  • Access to one Android 15 device and one iOS device with Minecraft Bedrock installed and at least one test World (FR-4)
  • A recruitment channel for five interview parents and three non-technical hallway-test parents with Android 11+ phones (PRD §9 Q2; owner's own network assumed)
  • A private, non-repo location for raw evidence (interview notes, sign-up emails, hallway-test observations) — combsmith/worldchest is public

Planned from idea discussion #6 by the BMAD Scrum Master initiative-planner. Inert until a maintainer adds initiative:auto.

Activity

  1. don-petry commented on Oct 22, 2026

    @don-petry
    ContributorAuthor

    Owner decisions on the planner's open questions (2026-10-22)

    PRD updated in #16.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions