docs(#5365): production-HA evidence table + plan closure (closes #5352/#5353/#5354) - #5375
Merged
Merged
Conversation
Phase 4 of the production-HA plan (#5354), sub-issue #5365: the final acceptance evidence and the closure of the three parent issues. evidence.md gains the "Production-HA acceptance (#5354)" section: - one row per executed sub-issue (#5356-#5362, #5364) with PR, squash-commit, test files, reproducible test command, backend and topology, all marked PASS under the full local-CI pipeline (the verification of record during the Actions outage) - #5363 marked NOT PLANNED with the deferral rationale and the compensating in-process coverage - a section documenting the blind-merge repairs #5367 carried (develop was compile-red before it) so reviewers of the outage window have the full picture - the 21-criterion mapping (A1-A5 / B1-B6 / C1-C10) from the three parent issues to the landed sub-issues production-ha-plan.md is marked COMPLETE with pointers to the evidence section. With this, the plan's closure condition is met: the evidence table records every executed sub-issue, and the parents (#5352 data-path, #5353 control-plane, #5354 production HA) close on it. Closes #5365 Closes #5352 Closes #5353 Closes #5354 Co-authored-by: qqeasonchen <qqeasonchen@gmail.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
What this PR does
Closes #5365 — Phase 4 / the final sub-issue of the production-HA plan (#5354): the acceptance evidence table and the closure of the three parent issues.
1.
evidence.md— new "Production-HA acceptance (#5354)" section.github/workflowstask-for-task).2.
production-ha-plan.mdmarked COMPLETEwith pointers to the evidence section.
3. Closure
With this, the plan's closure condition is met — the evidence table records every executed sub-issue, and the parents close on it:
Closes #5365 · Closes #5352 · Closes #5353 · Closes #5354
Co-authored-by: qqeasonchen qqeasonchen@gmail.com