You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
[upstream-adapt] List recently changed calendar events including cancellations #166
Users and agents can list events modified since a point in time across one or more calendars, including cancellations, for sync and briefing workflows.
Why
Upstream calendar changed is a clear gap for incremental calendar awareness.
Context
Source: upstream feature review of openclaw/gogcli (2026-08-11)
Intake rule: adapt the outcome in our architecture — do not cherry-pick or copy upstream implementation
Suggested triage priority: P1
Area: Calendar
Non-goals for this issue
No prescribed flags, package layout, or upstream file ports
No requirement to match upstream UX naming
Implementation design happens during triage / agent brief
Acceptance (triage will refine)
Desired user/agent-visible outcome is clear and still wanted
Not already fully covered by current main
Scope is bounded enough for an agent brief (or split)
Category: enhancement Summary: List calendar events changed since a timestamp, including cancellations
Current behavior:
Calendar event listing supports one, selected, or all calendars and filters by event time range. It does not expose an incremental "updated since" workflow and normal listing omits deleted events.
Desired behavior:
Allow callers to request events modified after an RFC3339 timestamp across the existing single- and multi-calendar selections. The result must include cancelled/deleted events needed by incremental consumers, preserve per-calendar identity, paginate correctly, and distinguish partial calendar failures from a complete result.
Key interfaces:
Calendar event list filters — support provider update-time filtering and deleted-event inclusion
Multi-calendar result and cursor — preserve independent pagination and per-calendar error reporting
Event output — include calendar identity, event identity, update time, and cancellation status
Acceptance criteria:
A valid changed-since timestamp filters on modification time rather than event start time
Cancelled events modified in the window are included with an explicit status
Single, selected-multiple, and all-calendar modes preserve the existing selection semantics
Pagination does not skip or duplicate events across calendars
Invalid timestamps fail before an API request
JSON and plain output expose stable event/calendar identities and partial failures
Closing as obsolete (GitHub sweep 2026-10-12). This [upstream-adapt] request asked to port an upstream steipete/gogcli CLI feature into our gog CLI. That CLI was retired in 91336b7 (#269); main builds only gog-mcp, so the command surface this request targets no longer exists. gog-mcp's pinned API catalog (internal/googlecatalog/manifest.json) already exposes the underlying Google method(s) (calendar.events.list with updatedMin/showDeleted) through --discovery=compact --api-catalog, subject to grants. New needs on the MCP side are filed as MCP-scoped issues (see #271, #273, #274, #278).
Activity
itsjeremyjohnson commentedon Aug 12, 2026
Agent Brief
Category: enhancement
Summary: List calendar events changed since a timestamp, including cancellations
Current behavior:
Calendar event listing supports one, selected, or all calendars and filters by event time range. It does not expose an incremental "updated since" workflow and normal listing omits deleted events.
Desired behavior:
Allow callers to request events modified after an RFC3339 timestamp across the existing single- and multi-calendar selections. The result must include cancelled/deleted events needed by incremental consumers, preserve per-calendar identity, paginate correctly, and distinguish partial calendar failures from a complete result.
Key interfaces:
Acceptance criteria:
Out of scope:
itsjeremyjohnson commentedon Oct 12, 2026
Closing as obsolete (GitHub sweep 2026-10-12). This [upstream-adapt] request asked to port an upstream steipete/gogcli CLI feature into our
gogCLI. That CLI was retired in 91336b7 (#269);mainbuilds onlygog-mcp, so the command surface this request targets no longer exists.gog-mcp's pinned API catalog (internal/googlecatalog/manifest.json) already exposes the underlying Google method(s) (calendar.events.list with updatedMin/showDeleted) through--discovery=compact --api-catalog, subject to grants. New needs on the MCP side are filed as MCP-scoped issues (see #271, #273, #274, #278).